Over our 25 year history, we have undergone several expansions in various facilities. In 2015, we will finalize the amalgamation of our Engineering, Fabrication and Assembly operations under one roof in our new campus. Designed to provide an organic flow from design through to assembly, the new campus layouts are built to our specific needs and create a comfortable, clean and light filled environment resulting in efficient production that reflect our corporate ethos. The 2-storey office is designed as a double wall façade with an external electrically activated sun control system to help reduce solar heat gain. This energy conscious design will enable ample natural light while reducing mechanical loads. In addition, we have teamed up with a solar panel cooperative who will harvest energy from over 200k square feet of solar panels on our roof. Our new facilities will be home to over 300 staff from all departments.